P -H ,*1M\ § 275 ELECTRICAL ENGINEERING PRACTICE (xiii) Manchester. Power : less than 200 units per quarter per measured E.H.P., IJd. a unit; then IJd. up to 299 units per E.H.P. pel- quarter; then Id. up to 399 units per E.H.P. per quarter, etc., finally reaching O7d. a unit. (xiv) Liverpool. Lighting : up to 3 000 units a quarter, 3Jd. a unit; then 3d. a unit up to 10 000 units ; then 2Jd. a unit. Power, 2d., l^d., and Id. a unit (within same range as lighting). 0. Maximum Demand (§ 272). (xv) Winchester. Lighting, 7d. a unit first hour's use, 4d. second hour's use, 2d. afterwards. Power, 3Jd. first hour, IJd. second hour, Jd. afterwards. (xvi) Ealkirk. Power, 2Jd. a unit first hour, IJd. afterwards, (xvii) Burslem. Lighting, 7d. a unit for 91 hrs.' use of M.D. per quarter, and 2d. a unit afterwards, the average not exceeding 5d, a unit. (Alternative, 5d. flat rate.) D. Fixed Charge per H.P. or kW -¥ Charge by Meter (§ 272). (xviii) St. James and Pall Mall (London). Power, 7s. 6d. per rated H.P. per quarter, plus Id. a unit, (xix) Dartford. Lighting, £12 per kW for first kW demand; £9 per kW for higher demand, plus Id. a unit, (xx) Falkirk. Power (above 20 H.P. installed), £2 10s. per H.P. maximum demand, plus |d. a unit; less 10 % on |d. rate for each 100 000 units taken per annum, (xxi) Beading. Power : exceeding 3 kW at 400 V continuous current, £1 a quarter per kW, plus |d. a unit up to 10 000 units a quarter, and Jd. a unit beyond; not exceeding 3 kW, 13s. 4d. a quarter minimum charge, plus Itjrd. a unit for consumption in excess of 20 units. (xxii) Manchester. Lighting, £7 per annum per kW M.D., plus IJd. a unit. Power, if over 600 units per E.H.P. per quarter, £1 5s. per E.H.P. demand per quarter, plus *d. a unit, (xxiii) Liverpool. Lighting, £2 per quarter per kW M.D., plus IJd. a unit. Power, £1 10s. per quarter per kW M.D., plus 0'4d. a unit. E. Fixed Charge per Lamp (§ 272). (xxiv) Carmarthen. Cottage lighting, 4d. a week per 30 W lamp, (xxv) Dunster. 50 c.-p. lamp, 3s. 6d.; 25 c.-p., 2s. 6d.; 16 c.-p., Is. lOd. a quarter. F. Saleable Value System (§ 273). (xxvi) Winchester. Lighting, 3s. per £1 rateable value, plus Id. a unit. (xxvii) Carlisle. Domestic tarif, 12J % on rateable value, plus £d. a unit, (xxviii) Manchester. Domestic power, 12Ji°/0 on rateable value, plus Jd. a unit for all purposes ; provided that domestic appliances other than lamps be installed to the extent of 2 kW iu houses of rateable value not exceeding £30; 3 kW, not exceeding £50 ; 4 kW, exceeding £50 rateable value. (xxix) Liverpool. 3J °/0 per quarter (2J °/0 for private houses only) on rate- able value, plus Id. a unit for all purposes.